See Home Value
$599,000
● House - Off Market

8405 Ganttcrest DR

Austin, TX 78749
bedrooms
4 Beds
bathrooms
2 Baths, 1 Half Bath
square feet
2,196 Ft²
$3,774
Est. Monthly
$22
HOA / Fees
4.50%
Cap Rate

About This Property

Brand new roof!

Located at the desirable Village at Western Oaks, this home features four spacious bedrooms and multiple living and dining areas, offering plenty of room for everyone. The bright, open-concept kitchen flows seamlessly into the family room, perfect for everyday life. Upstairs, the Primary Bedroom is a private retreat with a double vanity and a walk-in shower. Laundry room upstairs- super convenient!

Outside, the large, fully-fenced backyard is an oasis featuring a shaded patio for outdoor dining, a charming custom-built tree house, and a dedicated vegetable garden space. Top-tier Austin ISD schools include Mills Elementary (10/10), Small Middle School, and Bowie High School. The time to act is NOW-come see the value this home offers!
Unit Size
2,196 Ft²
Days on Market
-
Land Size
0.22 acres
Price per sqft
$273
Property Type
House
Property Taxes
$810
HOA Dues
$22
Year Built
1995

Payment Calculator

Cap Rate Calculator

Last updated: 10 months ago (Unlock MLS #ACT4387173)

Price History

Date / Event Date Event Price
Jan 23, 2026 In contract -
In contract
Dec 18, 2025 Price Decreased $599,000
↓ $11K (1.8%)
Price Decreased
Dec 3, 2025 Price Decreased $609,900
↓ $5K (0.8%)
Price Decreased
Nov 8, 2025 Price Decreased $614,900
↓ $4K (0.7%)
Price Decreased
Aug 23, 2025 In contract -
In contract
Show More

Property Highlights

Garage
Air Conditioning
Fireplace
With View

Building Info

Overview

    General

  • Year Built: 1995
  • Effective Year Built: 1995
  • Building Count: 1
  • Bedroom Count: 0
  • Bathroom Count: 3
  • Full Bathrooms: 2
  • Partial Bathrooms: 3
  • Building Condition: 6
  • Building Quality: 7
  • Construction Type: 17
  • Building Style: 0
  • Exterior Walls Type: 0
  • Interior Walls Type: 0
  • Roof Shape Type: 8
  • Roof Cover Type: 3
  • Floor Count: 200
  • Living Units: 1
  • Floor Cover: 0
  • Basement Type: 0
  • Basement Area: 0
  • Garage Type: 1
  • Garage Square Area: 416
  • Parking Space Count: 2
  • Patio Type: 20
  • Porch Type: 7
  • Pool Type: 0

    Dimensions

  • Lot Size Square Feet: 9,422
  • Lot Size Depth Feet: 1,400
  • Lot Size Frontage Feet: 660
  • Total Building Area: 2,612
  • Gross Building Area: 2,612
  • Building Area: 2,196
  • Building Area Measurement: L

    Heating and Cooling

  • Fireplace Count: 1
  • Air Conditioning: 1
  • Heating: 3
  • Heated Square Feet: 2,196
  • Heating Fuel Type: 0

    Utilities

  • Sewer System: 0
  • Water Service: 0

Building

  • Building Type: 0
  • Property Class: R
  • Subdivision: VILLAGE AT WESTERN OAKS SEC 11
  • Land Acres: 0000000216
  • Standard Land Use Code: 1001
  • County Land Use Code: A1
  • State Land Use Code: A1
  • Legal Description 1: LOT 14 BLK 13 VILLAGE AT WESTERN OAKS SEC 11

Neighborhood

  • School District Name: Austin Independent School District
  • School Tax School District: AUSTIN ISD
  • Census Tract: 031200

Geography

  • Assessors Map Reference: 0416360614
  • Account Number: 327143
  • Parcel: 327143
  • Block: 13
  • Lot: 14
  • Municipality: CITY OF AUSTIN
  • Latitude: 30.2116
  • Longitude: -97.8659

    Address

  • Full Address: 8405 Ganttcrest Dr
  • Address - House Number: 8405
  • Address - Street Name: Ganttcrest
  • Address - Suffix Type: Dr
  • State: TX
  • City Name: Austin
  • Carrier Code: C087
  • 4-Digit Zip Code: 3520
  • Zip Code: 78749

Valuation

    Tax

  • Tax Year: 2022
  • Tax Amount: $843,717
  • Tax Rate Code Area: 68

    Appraisal Valuation

  • Standard Deviation: 0.2444
  • Valuation Date: Aug 09, 2023
  • Confidence Score: 65
  • Final Value: 674,087
  • High Value: 838,861
  • Low Value: 509,314

    Market Valuation

  • Market Total Value: $640,223
  • Market Land Value: $250,000
  • Market Improvement Value: $390,223

    Assessments Valuation

  • Assessed Year: 2023
  • Assessed Total Value: $540,569

    Exemptions

  • Homeowner Exemption: Yes

    Sales

  • Current Sale Contract Date: Dec 23, 2020
  • Current Sale Recording Date: Dec 28, 2020
  • Current Sale Price:
  • Current Sale Document Type: 70
  • Current Sale Input Document Number: 2020251490
  • Previous Sale Recording Date: Nov 13, 2013
  • Previous Sale Contract Date: Nov 08, 2013
  • Previous Sale Amount: $275,000
  • Previous Sale Document Type: 40
Data used for valuation calculations is provided by RealtyHop, and other third party sources

Comparables

Unit
Status
Type
Beds
Baths
ft²
Price/ft²
Asking Price
Listed On
Closing Price
Sold On
HOA + Taxes

About Village at Western Oaks


Similar Homes for Sale

Currently no similar homes around

Nearby Rentals

Unit for rent at 8001 Wakefield Dr, Austin, TX, 78749

$3,295 /mo

  • 3 Beds
  • 2 Baths
  • 1,523 ft²
8001 Wakefield Dr, Austin, TX, 78749 Listing by Deep Parikh
Unit for rent at 4508 Chesney Ridge Dr, Austin, TX, 78749

$3,100 /mo

  • 3 Beds
  • 2 Baths
  • 2,338 ft²
4508 Chesney Ridge Dr, Austin, TX, 78749 Listing by David Bunyea
Unit for rent at 9325 Bavaria Ln, Austin, TX, 78749

$3,300 /mo

  • 5 Beds
  • 2 Baths
  • 2,931 ft²
9325 Bavaria Ln, Austin, TX, 78749 Listing by Janet Wang


Frequently Asked Questions

When was property at 8405 Ganttcrest Drive built and last sold?
The property at 8405 Ganttcrest Drive was built in 1995 and last sold on Dec 23, 2020 for $579,400.
How much is this home worth?
The estimated value of the home located at 8405 Ganttcrest Drive is $0.
What are some comparable homes to 8405 Ganttcrest Drive?
There are currently no comparable homes to 8405 Ganttcrest Drive.